Switch House Electrical Infrastructure

Switch House 34.5 kV distribution gear, overhead feeders, fiber optic trip system, and ring bus configuration.

Construction Dates:
September 2021 – November 2022

Total Project Value:
$7,500,000

Scope of Work:

  • Designed and installed new 34.5 kV distribution gear in an E-House
  • Constructed four overhead 34.5 kV feeders from utility substation to distribution building
  • Designed feeder system for seamless cutover from legacy gear
  • Designed and built fiber optic trip system for main feeders
  • Created a 34.5 kV ring bus for flexible, reliable power transfer
  • Programmed and integrated relays with utility for full system coordination