Rail Terminal

Electrical system for natural gas loadout facility.

Construction Dates:
January 2016 – July 2016

Total Project Value:
$470,000

Scope of Work:

  • Install 480 V MCC line-up.
  • Install controls, motorized valves, and motors to offload natural gas from railcars to onsite tanks.
  • Install fire suppression system including gas detectors, fire eyes, and emergency motorized valves for emergency shutoff.
  • Install laboratory for analyzing different
    products onsite.
  • Install fiber and computer systems.