ENGINEERING PROCUREMENT CONSTRUCTIONEPC SERVICES
Electrical Infrastructure Expansion
34.5 kV Plant medium voltage power distribution with GIS switchgear.
VIEW PROJECT![](https://bodecinc.com/wp-content/uploads/2022/01/Image-Frame-555px.jpg)
![](https://bodecinc.com/wp-content/uploads/2022/02/Graphite-5-scaled.jpg)
PV Collector Substation
& T-Line
54/72/90 MVA, 138 kV- 34.5 kV Reactive Power Design; 2 miles of 138 kV T-line, 397.5 ACSR “IBIS,” OPGW, & DTT.
VIEW PROJECTMining Operation Substation
30/40 MVA, 120 kV – 13.8 kV. Six outputs with 15 kV feeders.