PV Collector Substation
& T-Line EPC

PV Substation & T-Line Design Build

PV Substation – 54/72/90 MVA, 138 kV – 34.5 kV Reactive Power Design- Cap Bank, Four 34.5 kV Collector Inputs.

T-line – 2 miles of 138 kV T-Line, 397.5 ACSR “IBIS,” OPGW Communication, Direct Transfer Trip (DTT)

Construction Dates:
January 2021 – November 2021

Total Project Value:
$3,000,000

Scope of Work:

  • Multi-Discipline Design
  • Electrical- Power & SCADA
  • Civil
  • Structural
  • Arc-Flash, Short-Circuit, Relay Coordination Studies.
  • Relay/SCADA setpoint & programming.
  • Equipment specifications
  • On-site Construction Activities
  • Materials management and procurement.
  • Offloading/construction of control buildings.
  • System commissioning & start-up 3rd-party
    NETA testing.