Substations & Switchyards
PV Collector Substation
54/72/90 MVA, 138kV- 34.5kV
Eastern Utah substation collects three PV circuits of solar array power and feeds into the grid after stepping up the voltage to the 138kV transmission level.
View Project

Construction of Municipal Substation in Idaho
36/48/60 MVA, 161-46-12.47kV, 5 outputs with 12.47kV feeders, 1 output with 46kV feeder.
Electrical, Civil & Structural Construction. Install 46kV & 12.47kV feeder outputs. Tie in 161kV line. 3rd-party NETA Testing.
VIEW PROJECTSouthfields Substation – Heber Light & Power
Construction of Municipal Substation in Utah
Municipal Substation – Unique 138/46/15kV substation employs a 4-breaker ring bus configuration. The 46kV system includes five breakers serving three lines. The 12470V system includes 15kV switchgear with six feeders.
VIEW PROJECT