Natural Gas Compression, Water Transfer, & Water Disposal.

EPC of Electrical System with Automation Controls

EPC of Compressor & Pump Buildings

Construction Dates:
2011-2014

Total Project Value:
$3,500,000

Scope of Work:

  • Emergency Stop
    • Methane & Flame Detection
    • Gas Block/ Bleed Valves
  • Freeze Protection
    • Heat Trace
    • Heat Blankets
  • Liquid Level Tracking
    • Oil/Water Radar
    • Tank Transfer
    • Truck Load
  • Cooling Fan Control
    • RTD Readings
    • VFD Motor Controls
    • Louver Controls
  • Generator Specification Sizing
  • Main Electrical Service
  • MCC Distribution
  • Equipment Specifications
  • On-site Construction Management & Activities